Oversized & pivot entrances

An entrance with presence.

Oversized pivot doors and custom entrances bring scale to a home or development. Review the proportions, materials, pivot operation, hardware, and threshold alongside the requirements set by your architect or builder.

Review an entrance package
An open black-framed glass entrance door with full-height sidelights.
Product & design reference

Review the opening.
Then the package.

Define what your project needs before agreeing a product selection.

Locate and measure

Identify the door location, opening dimensions, quantity, and responsibility for field verification.

Resolve the operation

Describe handing, access, threshold, and hardware requirements before selecting a system.

Confirm the detail

Review the available materials and finishes alongside drawings and applicable product documentation.

Oversized and specialty exterior entrances are reviewed individually. Fire ratings, access-control compatibility, and suitability for a specific commercial application require separate product evidence and project-team acceptance.

Explore all products

Glass options

Choose the glass
for your project.

Review the glazing alongside the frame, opening size, configuration, and requirements of the building.

Low-E glass

Coatings selected to help manage solar heat gain and heat transfer.

Argon-filled insulated glass

Argon between the panes helps reduce heat transfer through the insulated glass unit.

Hurricane / impact-resistant options

Glazing and system options for coastal and high-wind project requirements.

Options vary by selected system. Confirm glass makeup, whole-unit performance, applicable test reports, dimensions, and installation requirements for your project. Impact-resistant glass alone does not establish the rating of a complete window or door.

The project conversation

From opening schedule
to agreed scope.

Work through the product details and responsibilities before committing to an order.

  1. 01

    Scope

    Start with the project location, drawings, opening schedule, quantities, and required timing.

  2. 02

    Specify

    Identify configurations, finishes, glazing, hardware, and the documents needed for project review.

  3. 03

    Price

    Review a defined package with the included scope, exclusions, delivery assumptions, and written terms.

  4. 04

    Agree

    Confirm approved details, responsibilities, milestones, and support terms before an order is placed.

Start with your schedule

Let’s look at
the whole package.

Your project location, opening quantities, and required timing are the starting point for a useful supply conversation.

Request project pricing